Skip to content

Services

Assembly first. Repairs when the house needs them.

Labor is $75 an hour, or ask for a fixed price. Ranges are for planning. Materials are separate.

Cedar backyard playset with a slide, swings, and rock wall

Playsets & swing sets

Playset kits assembled level, bolted tight, and walked through before I leave. Most kits take 12–25 hours.

Layout, assembly, and a safety walk-through. Anchors quoted if the yard needs them.

12–25

hours

Estimate
Pale cedar barrel sauna on a gravel pad

Saunas

Barrel and cabin sauna kits set square on a prepared pad, with the door and benches fitted clean.

Kit assembly on a pad you already have. Electrical hookup is a licensed electrician’s job.

6–20

hours

Estimate
Cedar garden shed with a dark metal roof

Sheds

Garden and storage sheds, from a kit or built custom, raised square so the door actually shuts.

Kit or custom. A new concrete pad is quoted on its own if you need one poured.

6–18

hours

Estimate
Freshly stained deck and timber pergola on a craftsman house

Decks & pergolas

Deck repair and refinishing. Pergolas built custom, or framed from a kit. Wash, sand, prime, stain, or a solid coating.

Custom pergolas are priced from photos. Boards and stain are materials, called out with the quote.

4–24

hours

Estimate
Steel power rack partly assembled on a gym mat

Home gyms

Racks, rigs, and machines bolted down where they belong, with the hardware counted twice.

Assembly and placement. Wall anchors only where the manufacturer calls for them.

2–12

hours

Estimate
Built-in closet with white shelves and a hanging rod

Closets & shelving

Closet systems and shelves set level, with rods that don’t sag and a layout you can actually use.

Install of a kit or a straightforward custom layout. No full remodel carpentry.

3–12

hours

Estimate

Also on the truck

  • Furniture assembly1–4 hrs
  • Drywall patch & texture2–6 hrs
  • Gutter repair2–5 hrs
  • Concrete patch & drains3–8 hrs
  • Canopy & cover framesQuoted on site

Not a licensed electrical or plumbing contractor. If a job needs a permit or a trade license, I’ll say so before anyone books it.